Capacity Enhancement Through Factory Reengineering
800 → 1,410 Machines in the reengineered knit unit 3.2 → 5.0 LAKH Monthly production capacity 218 → 147 SQ FT Space per machine UP TO 76% Increase in installed machines Short Summary
A leading Indian apparel exporter needed to expand capacity across multiple factories without relying entirely on new buildings. Cent Edge reconfigured factory roles, consolidated compatible units and redesigned material and production flow. The programme increased machine capacity, improved space utilisation, integrated value-add processes and created a more scalable manufacturing network within the available footprint.
Read Case Study →